KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  9-12-2009
Number of Hours:  3.00
Manual Reference:  12-4
Brief Description:  Upper cowling oil filler door fabrication

In another short work session I cut the opening in the upper cowling for the oil filler door. Then I bonded on a back up ring for the door to rest on when it is in the closed position. While the epoxy was curing I fabricated cylinder 2 and 4 upper ignition leads.
' style=

Upper cowling oil filler door opening cut

Upper cowling oil filler door opening cut

' style=

Oil filler door back up ring bonded on

Oil filler door back up ring bonded on

' style=

Cylinders 2 and 4 upper iginition leads fabricated

Cylinders 2 and 4 upper iginition leads fabricated

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.